PV System Profile
Location: | Tay Ninh, Vietnam |
Operator: | Shire Oak International |
Commissioning: | 30/12/2020 |
PV system power: | 5,125.5 kWp |
Annual Production: | 7,846,000 kWh (1,530 kWh/kWp/year) |
CO2 avoided: | 7,163 tons per annum |
Daigaku Vietnam produces high-quality wooden quality art frames, usually exported from Vietnam to Japan.
FABTEK manufacturing business has been operating in Vietnam since 2003. FABTEK manufactures quality products from steel, stainless steel and aluminum for a diversified range of industries worldwide. They make products in medicine, construction, agriculture, automotive, mining, food and beverage, plus many more industries. FABTEK offers customers a high level of service from product development to client specific branding and packaging.
The Hampole offshore wind farm is located in Hampole. UK. The project started commissioning in 2014 and is now in operation. It reaches a total capacity of 8,200 kW, which is contributed by four Senvion turbines.
Swansea Bay Tidal Lagoon will be the world’s first tidal lagoon power plant. The project was awarded a Development Consent Order in 2015 and is primed for construction. It will comprise 16 hydro turbines, a 9.5km breakwater wall, generating electricity for 155,000 homes for the next 120 years. The 320MW pathfinder project provides a scalable blueprint for our program, opening up the option of a fleet of larger UK tidal lagoons to generate renewable electricity at a scale and low cost not seen before.